Services · 08

Sourcing audits

A half-day walk through your facility, a count of what is really happening, and an honest page of arithmetic — including the recommendation to change nothing, when that is the truth.

Request an audit

Twelve seconds of typing beats a week of phone tag. Everything you send lands with a coordinator who knows the yard inventory.

Duration
Half day on site
Output
Written findings + model
Cost
Free above 500 units/week
Obligation
None
A working business address — we reply here, and only here.
US or Canada only. Area code + 7 digits — we format it as you type.
US ZIP (78728 or 78728-1234) or Canadian postal code (M5V 2T6). It must match the state.
Whole units, 1 to 1,000,000. Use the message field for anything approximate.

Fields marked * are required, and we check them properly — a bad phone number or a ZIP that does not match the state will come back to you. Read our privacy notice.

A warehouse floor filled with stacks of recycled pallets, some banded and wrapped, on a polished concrete slab.
Graded stock, under coverStanding-order accounts keep roughly two weeks of cover on the ground here.

Pallets leak. Finding out where is usually worth more than any price negotiation you will ever have.

What we count

  1. Inbound — how many units arrive, on whose pallets, in what condition, and who owns them.
  2. Internal — how many handling touches each unit takes, and how many get damaged by each one.
  3. Outbound — what leaves on your pallets, whether it comes back, and whether anybody is tracking that.
  4. Stranded stock — the stacks in the yard, behind the racking, and at the far end of the building that nobody has counted since the last stocktake.
  5. Disposal — what you pay to make broken wood go away, and what it is actually worth.
  6. Specification fit — whether the grade you buy is better than the job requires. This is the commonest expensive mistake.

What the report says

One page of findings, one page of arithmetic, and a short list of changes ranked by how much each saves against how annoying it is to implement. We write the no-change case too: roughly one audit in five concludes that a customer's current arrangement is already close to optimal, and saying so is the only reason the other four trust us.

1 in 5Audits recommend no changeand we say so in writing
12–24%Typical cost-per-trip savingwhere change is recommended
Half a dayOf your team's timethat is the whole ask

Service appendix

Lead times, minimums and the process behind them. Published rather than quoted on request, because a lead time you can plan around is worth more than a lead time that sounds good.

Every service, with its lead time

ServiceLead timeMinimumNotes
Paid pallet collection, Austin metro48 hours, routed100 units or 1 trailerCounted with your team present, signed on the dock
Paid collection, Texas TriangleWeekly, fixed day1 trailerBackhaul lanes to SA, Houston, DFW
Yard drop-offOpen during yard hours5 unitsSaturday mornings are easiest; no appointment
Spot load, common footprint2–5 business days25 units deliveredSubject to grade availability
Standing orderFixed day each weekBy agreementAnnual pricing, ≈2 weeks of safety stock held here
Repair, toll (your units)3–7 business days100 unitsYour asset numbers and stamps retained
Heat treatment & ISPM-15 stampingUsually 24 hoursBy agreement4–9 hour cycle; chart trace filed per lot
New build to spec5–10 business days100 unitsTolerance ±⅛" achievable
Cut-down to custom footprint3–6 business days50 unitsTolerance ±¼"
Custom crate, one-off3–8 business days1On-site crating available in Austin metro
Custom milling, cut list3–6 business days1 shop hourTolerance ±1/16" dimensional
Bulk mulch or bedding2–5 business days10 cu yd60 mile delivery radius
Sourcing auditBy arrangement500 units/weekHalf a day on site; free above that volume
Same-day, Austin metroSame dayBy arrangementPremium rate, when a line is about to stop

All times Central. Lead times are commitments we take seriously and not guarantees against weather, road closure or equipment failure.

What happens between the gate and the trailer

  1. 01

    Gate & segregation

    Weighbridge ticket, then sorting by treatment type and origin before anything is cut. Painted, treated or unknown-origin wood is separated here and never enters the mulch or bedding lines. Contaminated material is refused.

  2. 02

    Breakdown & inspection

    Units are broken down and inspected board by board. Deck boards are flexed by hand; anything that creaks, splits at a nail hole or shows end-grain separation comes off.

  3. 03

    Stringer judgement

    Cracks longer than a third of the stringer depth, or any crack crossing a notch, send the member to the plug bench or condemn it. This single check decides most of the economics.

  4. 04

    Repair & re-nail

    Board swap, companion board, plug, plate, trim. Then every fastener on the unit is driven or replaced — the invisible half of the work, and the part cheap yards skip.

  5. 05

    Moisture & square

    Pin meter on random units per lot, reading recorded. Diagonals measured; out-of-square beyond ½" is corrected, not shipped. Above 19% MC the load waits in the dry stack or goes through the kiln.

  6. 06

    Grade, stamp & lot

    Grade, build date and lot in soy ink on a stringer face, so a disputed load traces back to the bench and shift that built it. Heat treatment and IPPC marking for anything crossing a border.

The repair vocabulary

RepairWhat it isBench timeEffect on grade
Board swapCracked deck board out, sound reclaimed board of equal thickness in60–90 secA → B
Companion boardA second board nailed alongside a cracked original45 secA → B
Stringer plugCracked stringer section cut out, matching plug let in and double-nailed3–5 minA → B
Metal plateGalvanised plate across a stringer crack45 secA → B, disclosed
Full re-nailEvery fastener on the unit driven or replaced90–120 secNo change — standard on anything apart
Trim / cut-downOversized unit sawn to a smaller footprint, cut edge re-nailed and chamfered4–8 minBecomes a custom unit
Re-stampISPM-15 mark re-applied after re-treatment—No change
Condemn & harvestSound boards to the repair bench, remainder to fiber2 min—

We never plate a stringer and call it Grade A, and never hide a companion board under a label. The four checks at the bench, in order: stringers sound? how many deck boards gone? end-grain separation? is the footprint worth the labour?

Where every pound goes

StreamDestinationShare of intake massVerified by
Reusable wholeGrading and resale71%Unit counts + weighbridge
RepairableRepair benches20%Bench lot records
Board harvestRepair stock for other units3%Internal transfer tickets
RemanufactureCut-downs, crate components, collar panels, furniture2%Shop records
Material grindMulch, bedding, path and arena fiber3%Grind batch weights
Industrial fuelRegional boiler — never called recycling1%Outbound scale tickets
MetalScrap recycler by weight<1%Scrap receipts
Landfill—0.0%Quarterly third-party audit since 2016

2025 averages by mass. Landfill has no row because it has no tonnage. Part of how that stays true is refusing material we cannot route: painted, stained or pressure-treated lumber, engineered panel, and anything contaminated with food residue, chemicals or hydrocarbons.

What drives the price you are quoted

Cost componentShare of a recycled unitWhat moves it
Labour35–45%Local wages. The largest and stickiest cost.
Core acquisition20–30%What we pay warehouses for their empties. The main driver of market swings.
Freight15–25%Diesel, driver availability, truckload capacity. Pallets are mostly air.
Repair materials5–10%Fasteners; harvested boards cost labour rather than lumber.
Yard, plant and compliance5–10%Rent, grinder, chambers, audits, insurance.
New lumber0% on a recycled unitSets the price of a new pallet, which sets a ceiling on recycled by substitution.

This is why a falling lumber futures chart does not translate into a proportional fall in recycled prices: there is no new lumber in the cost structure. Lumber spikes pull recycled prices up quickly on demand; lumber crashes push them down slowly, because the cost floor is labour and nobody's wages fell.

And when in the year you are quoting it

PeriodCore supplyDemandPrice pressure
January – FebruaryPlentiful — post-holiday backlog clearsSoftLowest
March – MayNormalRising — spring construction and beverageFirming
June – AugustTightening — summer slowdowns, heat limits bench outputHigh — beverage peakFirm
September – NovemberTight — everything is shipping, nothing is sitting stillPeak — pre-holiday buildHighest
DecemberErraticFalling fast after mid-monthFalling

Central Texas pattern. Agricultural regions invert parts of it — harvest demand can make September the tightest month for an entirely different reason. A standing order with annual pricing gives up the January bargain and avoids the September shock, which is a trade most operations should make.

Commercial appendix

The arithmetic behind a pallet decision, the sector matrix, and the four decision trees we walk customers through.

Cost per trip, worked

LineOne-way recycledRepaired recycled, 6 tripsNew build, 10 tripsPooled rental
Unit cost delivered$11.50$13.00$26.00$0 capital
Useful trips1610per trip
Cost of the asset per trip$11.50$2.17$2.60$5.50 issue fee
Freight per trip$1.80$1.80$1.80included
Repair share per trip—$0.55$0.42included
Handling labour per trip$0.90$0.90$0.90$0.90
Loss / non-return per tripn/a$0.30$0.75$2.10–6.00
Disposal$0.40creditcreditn/a
Cost per trip$14.60$5.72$6.47$8.50–12.40

A worked illustration using mid-2020s Central Texas figures, not a quotation. The decisive line is loss: pooling and new builds are both excellent until units stop coming back, and the pooled range above reflects return rates between 90% and 55%. Model your own return rate before you model anything else.

Building your own model

  1. Delivered unit cost. Not the quoted unit price — add the freight to your dock.
  2. Useful trips per unit. Ask your supplier, then halve it until you have your own data.
  3. Return rate. Of units leaving your building, how many come back into your control? Operations assume 80% and discover 45%.
  4. Repair cost and repair rate. What share needs work per cycle, and at what price.
  5. Handling labour. Count touches, multiply by minutes, multiply by fully loaded labour cost.
  6. Disposal or credit. A yard that pays for broken units turns this line from a cost into revenue.
  7. Failure cost. Rare, expensive, and the reason cheapest-per-unit is not cheapest-per-trip.
  8. Then divide. Total cost ÷ useful trips. That is the only number worth negotiating on.

What each sector actually needs

SectorUsual footprintUsual gradeThe spec that matters mostFailure that costs most
Grocery & retail distribution48×40A / #1Deck gap and appearanceRejection at a retail DC door
Food manufacturing48×40A / #1Moisture ≤15%Mould transfer to packaging
Beverage48×40, 40×48A / BRacked rating, deck strengthRack deflection under dense load
Construction & building supply48×40, 48×48B / #2Racked rating, outdoor creepRack incident under bagged goods
Agriculture & produce48×40, binsB, HT onlyVentilation, treatment segregationChemically treated wood near feed
Chemicals & paint42×42, 48×48A / BSquare footprint, drum stabilityDrum shift in transit
Automotive48×45, customA / newTolerance, returnable designLine stoppage
Pharmaceutical48×40, newNew / plasticDocumented custody, cleanabilityAudit failure
3PL & warehousingMixedPer clientAsset tracking, written standardsUnbilled pallet leakage
Manufacturing & electronicsCustom, 48×40A / #1 / newSquareness, entry heightASRS rejection, jammed jack
Export & freight forwardingDestination'sB + HTISPM-15 truthContainer held on a quay
Hospitality & events48×40, halfB / #2Collection frequencyService corridor blocked

Decision trees

Recycled, new, or cut down?

  1. Does a standard footprint fit your carton pattern with no overhang? If yes → recycled.
  2. If no: does an oversized footprint exist in reclaim that can be sawn to your size? If yes → cut down, at roughly a third of a new build.
  3. Does anything automated read the pallet's geometry, or do you need ±⅛"? If yes → new build.
  4. Is the racked load above about 2,500 lb? If yes → new build, mixed hardwood, block construction.
  5. Is a documented chain of custody for the wood itself part of an audit? If yes → new build.
  6. Otherwise → recycled, at the lowest grade that survives the journey.

Buy, own a fleet, or rent from a pool?

  1. Measure your return rate first. Everything below depends on it and nothing else matters as much.
  2. Below 50% return → your pallet is packaging. Buy recycled one-way and price it as consumable.
  3. 50–85% return → the messy middle. Buy recycled on a managed programme, with collection on the same movements.
  4. Above 85% return, with controlled geography → own a fleet and use toll repair to keep your asset numbers.
  5. Mandated by a retailer's pool, or shipping to hundreds of points needing identical quality → pool rental, and budget for loss charges.
  6. Wash-down hygiene is a process requirement → plastic, and we will point you to somebody who sells it.

Stringer or block?

  1. Does it go into racking where you cannot guarantee orientation? Block.
  2. Do powered jacks enter from the 48" side? Block.
  3. Automated storage and retrieval? Block, or new.
  4. Heavy load sitting for months? Block, mixed hardwood.
  5. European or ISO-metric footprint? Block by specification, not preference.
  6. Otherwise → stringer: lighter, cheaper, deeper in recycled stock and easier to repair.

Repair or replace?

  1. Crack crossing a notch, or more than a third of a stringer's depth? Plug, or condemn.
  2. Three or more stringer repairs already present? Condemn — that is a pallet held together by optimism.
  3. Four or more deck boards gone on a low-value footprint? Harvest the boards.
  4. Above 24% moisture? Dry stack first, then decide.
  5. Contaminated with oil, chemicals or paint? Out of every reuse stream, permanently.
  6. Otherwise → repair and re-nail fully, at roughly a third of replacement cost.
Get a quoteFull form · no phone needed